CEF-T-2024-SIMOBGEN-SESAR-OP-WORKS: Other ATM Projects – works

12 February 2025|
Objective:

The objective is to modernise transport infrastructure on the Core and Comprehensive Networks of the TEN-T.

Scope:

In accordance with the Article 9(2)(b)(ii) of the CEF Regulation, this priority will support projects that implement Communications, Navigation and Surveillance (CNS) ground and airborne infrastructure, routes, procedures and training that are related to the provisions of the EASA Basic Regulation (EU) 2018/1139.

  • Performance Based Navigation (PBN)
  • Projects in this domain must implement PBN routes and procedures, in accordance with the requirements of the PBN Regulation[1], whose deadline for implementation is 6 June 2030. Projects/actions aiming to implement RNP approaches that were subject to the 2020 or 2024 regulatory deadlines are not eligible.
  • Projects must implement at least one of the following:
  • TMA airspace optimisation, which shall consist in implementing SIDS and STARS using required PBN specifications as an integral part of an airspace re-design project that contributes to increasing capacity and efficiency or to reducing emissions and noise.
  • The proposals must describe how they will implement SIDS and STARS using PBN specifications, not only as an additional overlay of existing procedures, but as an integral part of airspace re-design. The proposals should indicate the expected benefits in terms of capacity, safety, cost efficiency, noise

    ...