HORIZON-CL5-2024-D4-02-03: BIM-based processes and digital twins for facilitating and optimising circular energy renovation (Built4People Partnership)

06 November 2024|
Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Reduced buildings construction and renovation time and costs.
  • Increased buildings material reuse and recycling.
  • Improvement of buildings performance (energy, sustainability including whole life-cycle carbon and the potential to store carbon in built works, comfort, health and well-being, and accessibility).
  • Enhanced, interoperable and accessible buildings information across the lifecycle.
  • Improvement of interoperability with existing Building Information Modelling (BIM) and Digital Twin solutions.
  • Broader application of BIM and Digital Twin solutions, in particular within SMEs.
Scope:

To improve Building Information Modelling and Digital Twinning over the full life cycle of buildings, including construction and renovation of buildings, towards enhanced energy efficiency and sustainability and in compliance with circular economy and resource efficiency principles.

Proposals are expected to address all of the following:

  • Develop and integrate solutions based on BIM and Digital Twins to support the whole buildings life cycle from design to deconstruction and reuse, including operation.
  • Ensure the solutions developed address all the following aspects:
    • Supporting optimal, adaptable and reversible building design for energy efficiency, circularity and sustainability.
    • Allowing to track buildings materials and construction products, and supporting cost-effective deconstruction and reuse, recycling and recovery of building materials at end of life.
    • Integrating buildings monitoring data
...
To read this content please subscribe or upgrade your Membership.